From our shared portfolio: this project was delivered under the Thunder City Pro name. Original project credits are retained here.
Behind the experience.
Thunder City Pro recently completed a project assisting Orlando City Soccer Club with upgrades to their in house control room. Now ready for the 2026 soccer season, the upgrade was centered around building a workflow that is stable, scalable, and flexible enough to support both current and future production needs. Thunder City Pro led the project through system specification, architecture design, and procurement, ensuring the entire system was aligned from a signal flow, timing, and control standpoint before deployment.
Thunder City Pro acted as a trusted advisor throughout the project, working directly with Orlando City to define the system at a technical level including routing capacity, audio transport, synchronization, and control. Rather than a one size fits all approach, the system was designed specifically around their operational needs. All core equipment was specified and procured by Thunder City Pro, ensuring compatibility across all subsystems and eliminating integration issues downstream. This approach allowed Orlando City’s team to execute the installation while having clear technical direction and a system that was engineered to work as a complete solution.
Core System Components:
Video Routing
Evertz NEXX 128x128 SDI router
Full embedding and de-embedding
Frame synchronization on first 32 inputs
Audio (Dante Integration)
NEXX Scorpion card with 128x128 MIO Dante audio
(2) Evertz MIO-UDX interfaces
Production Switching
Grass Valley K-Frame VXP (24x12)
Korona 2-stripe control panel
Timing & Sync
Evertz 5700MSC-IP Master Clock
Control & Redundancy
Redundant Evertz Magnum control servers
Thunder City Pro stands apart by working within each client’s needs instead of forcing a fixed integration model. Whether the project requires full design and installation, procurement only, or technical guidance alongside an internal team, TCP is flexible enough to find the perfect fit. Every system is designed to integrate with real-world operational constraints and fit the client’s workflow, not force them to change it.
TCP provided system specification, architecture design and procurement for Orlando City’s control-room upgrade. The scope connected routing, audio transport, synchronization and control. Orlando City’s team performed the installation, using the system plan and technical guidance supplied by TCP.
Planning an owner-installed upgrade
When the in-house team will install the system, agree the design detail and handoff responsibilities early. Clarify connection points, retained equipment, configuration ownership and the verification plan. A useful specification explains how the parts fit together as well as what to purchase.